Azizi Riviera 8

Azizi Riviera 8

Azizi Developments
By Azizi Developments
Emirates
Starting from :
$

Overview

ABOUT AZIZI RIVIERA 8

Azizi Riviera 8 is a residential phase of the larger Azizi Riviera master-plan in Meydan One / MBR City, developed by Azizi Developments. It features mid-rise buildings designed with Mediterranean-inspired architecture, combining waterfront living with modern urban convenience. The project includes resort-style amenities such as a lagoon, landscaped promenades, and palm-lined boulevards to evoke a coastal-village feel.

 

PROPERTY

COMMUNITY OVERVIEW

Azizi Riviera is a master-planned, waterfront community in MBR City (Meydan One), offering a balanced mix of open green spaces, retail, and residential zones. Within Riviera 8, residents benefit from proximity to a 2 km crystal lagoon, promenade paths, and community parks. The area is well-connected through major roads and offers easy access to Downtown Dubai, Meydan Racecourse, and key urban amenities. Riviera’s community feel is enhanced by walking paths, waterfront cafés, and landscaped social spaces.

 

PROPERTIES IN AZIZI RIVIERA 8

Interiors are designed to blend open-plan layouts, large windows or balconies, and modern Mediterranean-style finishes. Amenities for residents include landscaped parks, swimming pools (including a children’s pool), a health club / gym, well-being and fitness areas, and security.

 

SALE TRENDS IN AZIZI RIVIERA 8

Studio, 1 and 3 Bedroom Apartments starting from: AED 680,000

 

LOCATION

  • 1 min to Al Khail Road

  • 2 mins to Meydan Racecourse

  • 10 mins to Downtown Dubai

  • 15 mins to Dubai International Airport (DXB)

 

FAQs

Where is it located?

Meydan / MBR City, Dubai

 

When is the expected delivery date?

Q2 2023

 

What types of properties are available?

Offers studio, 1- and 3-bedroom apartments with modern finishes, Mediterranean-inspired design, and access to community amenities like lagoon, pools, parks, and gym.



Payment Plan

InstallmentsPercentage (%)Hint
Down Payment
10
%
Launch
During Construction
40
%
~
On Handover
50
%
Q2 2023

Photo Gallery